Last updated on 25th October 2007                        
© 2005-2007 MIP                                     
You are the visitor number 
                          

Members' Area

Home History Organization Documents Contact
Miscellaneous

You are at:

  History> IOT&E

Best viewed at 
1024 * 768

Interoperability

  Interoperability of information is essential and an assured capability for this is vital.  The successful execution of fast moving operations needs an accelerated decision-action cycle, increased tempo of operations, and the ability to conduct operations simultaneously within combined/multinational formations.  That is precisely what MIP is working for.


Commanders require timely and accurate information.  Also, supporting command and control (C2) systems need to pass information within and across national and language boundaries.  Additionally, forces must interact with non-governmental bodies, and international and national aid organisations.


  Information technology will act as a force multiplier to enhance operational effectiveness at each level of command by enabling the sending, receiving, filtering, fusing, and processing of ever-increasing amount of digital information.


Forewords

  The IOT&E is not only structured to provide an operational assessment of the MIP interface and the value it adds to the warfighter, it also provides an opportunity to see the C2 systems of the participating nations in an operational context; their similarities and their differences. 


It’s important to note that the IOT&E, while a defining event for MIP, is just the first step on the path to achieving the objective requirements for interoperability.


Agreement of the members on a way ahead beyond the IOT&E to include synchronization of materiel fieldings during the in-service periods, blocking of requirements for future implementations and the provision of incremental capability enhancements has been achieved. 


The way ahead provides a road-map for achieving the defined objective interoperability requirements which will ensure future MIP and coalition interoperability. A successful IOT&E is a necessary initial milestone along this path.


In the Visitors booklet you can find additional information on the IOT&E, including a short description of the national systems that took part.


Systems

 
Canada


Netherlands
Denmark
Norway

France 1

Potugal

France 2

Spain

Germany

United Kingdom

Italy

 USA

Figures

11 nations playing (13 participating).

13 Tactical Command posts.

12 different national C2IS deployed.

13 MIP interfaces deployed.

394 participants.

Approx 550 visitors.

70 hrs scenario played.

More than 1200 events played.


MIP_IOT_Auditorium.JPG (46612 bytes)

IOT&E Auditorium


 

Site Map       

Home

MIP News

MIP Concept

Nav & Caveats


History

ATCCIS

Block 1

IOT&E

Baseline 2


Organization

MSG

PMG

Operational

Data Model

Engineering

Test & Eval

Conf Control


Documents

XML 1

XML 2

XML 3

Library


Contact



 Download here

 Acrobat Reader

 

 Contact the

    Webmaster

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IOT&E

(Block 1 Integrated Operational Test and Evaluation)

Five out of twelve Systems displaying the same situation awareness on their screens!

       


Features.

What was the IOT&E about? When it took place and what it was for.

Objectives. Find here the IOT&E objectives.

Outcome. Most remarkable results.

Photo Album. Take a glance at some pictures.


 

 

The Multilateral Interoperability Programme (MIP) conducted an Integrated Operational Test and Evaluation Exercise from 8th to 26th September 2003 at the C2 Support Centre in EDE (NL).

 

  The intention of this event was to prove and demonstrate interoperability of information between the National C2IS of 12 members.  This capability gap is growing in significance for NATO, the significance lies in the nature of the capability delivered, which is that C2 systems that are otherwise completely different from each other may, nevertheless, interoperate and share information. For those who are members of the MIP community and have a MIP username and password, please press the Members' Area button to access the full repository of MIP official information. 

*Click here for information about membership.

 

Top


 

Objectives.

 

The IOT&E objectives were:

 

To confirm the operational fieldability of the Message Exchange Mechanism (MEM) in accordance with MTIR Baseline 1 requirements.

 

To test and evaluate the operational fieldability of the Data Exchange Mechanism (DEM) in accordance with the MTIR Baseline 1.

 

T0 test and evaluate coexistence of MEM and DEM implementations of MIP Baseline 1.0.

     MIP_IOT_Flags.jpg (124833 bytes) MIP_IOT&E_ORBAT.jpg (42998 bytes)
     Participant Flags Operation order    ORBAT   Schedule Organization

* Click on the pictures to enlarge.

 

Top


 

Outcome.

 

Initial Findings.

The IOT&E results indicate that:

The MSG defines the overarching Programme objectives, strategy, milestones and Programme phase capstone events; It provides overall guidance and is the decision authority for the Programme. The MSG is the final multinational authority for resolution of Programme issues and risk mitigation. The MSG assigns Member responsibilities for WGs. The MSG is responsible for the MIP Statement of Intent (MSOI).

 

The MIP interface performed well and supported the exchange of data necessary to establish the Common Operational Picture.

MIP_IOT_Corps_Situation.jpg (87091 bytes)
MIP_IOT_Bde_Situation.jpg (89359 bytes)
 

Further development is required in certain areas such as:

 

Operational procedures for information exchange over the MIP interface need to be further defined, agreed and incorporated into national SOPs.

 

MIP Technical specifications need to be “tightened up”.

 

National C2IS differ in capability and, therefore, are not able to utilize all exchanged data at the present time.

Current implementations are planned for use in future exercises and can provide an initial operational capability if required

*Click on the pictures to enlarge

Final Report.

The detailed report on IOT&E was prepared with a meticulous analysis of the data captured during the scenario. In MSG–4 the Final Report was presented, approved and then  distributed to all MIP members.

This report is now included in the Baseline 1 documentation (End of Block Report) as agreed.

 

Top


 

Photo Album.

 

Find here some photos from this event. Click on the photos to enlarge

  MIP_IOT_FR_Comp.jpg (142196 bytes) MIP_IOT_GE_Comp.jpg (66059 bytes) MIP_IOT_SP_Comm.jpg (102822 bytes) MIP_IOT_US_Comp.jpg (72136 bytes) MIP_IOT_NL_TOC.jpg (128055 bytes)
  MIP_IOT_CA_Comp.jpg (78796 bytes) MIP_IOT_UK_Comp.jpg (91680 bytes) MIP_IOT_SP_TOC.JPG (53268 bytes) MIP_IOT_IT_TOC.jpg (41428 bytes) MIP_IOT_PO_TOC.jpg (78305 bytes)
  MIP_IOT_IT_Comp.jpg (59668 bytes) MIP_IOT_NO_TOC.jpg (45332 bytes) MIP_IOT_DA_TOC.jpg (43604 bytes) MIP_IOT_FR_TOC.jpg (79138 bytes) MIP_IOT_CA_TOC.jpg (118639 bytes)

* Click on the pictures to enlarge the image.

 

Top


IOT&E

(Block 1 Integrated Operational Test and Evaluation)

What was the IOT&E about? Objectives. Outcome. Photo Album.


You are at:

  History> IOT&E

Best viewed at 
1024 * 768

Members' Area

Home History Organization Documents Contact
Miscellaneous

       
     

 

 

Last updated on 25th October 2007                        
© 2005-2007 MIP                                     
You are the visitor number